|
|
Protech Garden Buildings |
|
Garden Buildings > Installation Steps
| Attach
base channel to foundation:
Instruction materials you receive show an easy way to make sure channels are anchored square to assure quick assembly |
![]() |
|
|
|
||
|
|
Slide
panels together into channel:
No tools are needed. Just identify the appropriate wall panels and slide together. They lock in position |
|
|
|
||
| Place
roof gables over walls:
The gables slide into position at the front and back walls to support the ridge beam |
![]() |
|
|
|
||
![]() |
Attach
ridge beam:
This beam is one reason for the super strength of the building. It allows the roof to support loads up to 25lbs/sq.ft |
|
|
|
||
| Slide
in the roof panels:
These click into the ridge beam and form a tight, weatherproof roof that never needs shingles |
![]() |
|
|
|
||
![]() |
Attach
roof fascia caps:
Secures easily with screws |
|
|
|
||
| Mount
Doors:
Simply fasten the hinges to the doors then attach the doors to the door jambs using hinge pins |
![]() |
|
Back to Garden Buildings | Contact Us | Email Us
Protech Garden Buildings, a division of Protech Ltd, a member of
The BB Group of Companies
Bermingham House, Blue Bridge Centre, Horndale Avenue, Newton Aycliffe Ind Park
Newton Aycliffe, Co Durham DL5 6DS
Tel: +44 (0)1325 310520
© These web pages and the information and images within them are copyright of The B.B. Group of Companies
Our recommended home improvement websites are listed below:
Plastic
Sheet, Mirrors & Canopies
Easyfix
DIY Conservatories
Easyframe
DIY Conservatories
Houseproud
uPVC Self-build Conservatories
Protech Windows
& Doors
Secondary Double
Glazing
Garden Buildings,
Glazing & Security