| 19. Jack bars and hip bars
will be prepared with the connecting mechanism. Simply offer the jack
bar into position, pull back the spring and hook onto the locating
tab. Proceed to tighten the bolt that strikes the eaves beam. |
 |
25. Fold down the lead-flashing onto the
ridge top cap and end rafter top cap to seal. |
 |
 |
26. Seal glazing end closure to polycarbonate
as shown here. Ensure this is done before glazing
the roof. |
 |
| 21. Offer up the capping to the roof. Using
a plastic glazing mallet and working from the back wall, gently knock
the ridge top-cap down into position. |
 |
27. The internal radius end capping will
need trimming according to the pitch of the roof. Then simply clip
fit the cap to the body of the radius end using the appropriate tabs. |
 |
| 22. Install the remaining glazing panels
one at a time; sealing over the top cap where it meets the rain excluder. |
 |
28. Clip the internal ridge clading onto
the underside of the ridge. |
 |
| 23. The jack rafter top cap has been pre-cut
to the correct angle. Gently knock the cap into place and silicone
seal the joint between the jack rafter top cap and the hip cap. |
 |
29. Silicone seal all of the
internal eaves beam joints before tapping the internal eaves cladding
onto the eaves, slide in the corner joiners as you work around. |
 |
| 24. If you are installing a roof vent,
click here for instructions. |
 |
 |